Pakistan News Service

Monday Jul 23, 2018, Zul-qaadah 10, 1439 Hijri
Logo Logo
LATEST :
Pakistan News Home -> Tribune Corner -> News Details

Shahid Khaqan Abbasi directed an overhaul of the power transmission

29 December, 2017

  Related News  
We cannot do more on dictation from any country: ISPR
Bilawal Bhutto held Pervez Musharraf responsible for assassination of Benazir Bhutto
  More on this View All

ISLAMABAD: Prime Minister Shahid Khaqan Abbasi on Thursday directed an overhaul of the power transmission, distribution and recovery process of the Distribution Companies (DISCOs) to cut down inefficiencies,

lessen administrative losses and to find a permanent solution to the issue of circular debt.

He was chairing a meeting here at the PM Office to review issues related to furnace oil and petroleum and was attended by Minister for Power Sardar Awais Ahmed Leghari, Secretaries of Finance, Power and Petroleum Divisions, MD PSO and senior officers of concerned departments.

The meeting also reviewed availability and consumption of gas by the power sector.

The Prime Minister directed for constitution of a high level committee to find solution to the issue of circular debt.

The committee would be headed by the Minister for Power and would include representatives of Ministry of Finance, Power and Petroleum Division.

The meeting, took stock of the existing storage, production capacities of the local refineries and consumption, and decided to restrict import orders for the furnace oil.

Future import of furnace oil would be conditional to the approval from Cabinet Committee on Energy. The measure would help reduce import bill and ensure optimal operationalization of Liqufied Natural Gas-based power plants.

The Prime Minister directed Ministry of Power and Ministry of Petroleum to ensure proper planning to ensure maintenance of required stocks of furnace oil to meet any emergency situation.

Minister for Power Sardar Awais Ahmed Leghari briefed the Prime Minister on steps taken by the Ministry towards streamlining the provision of new electricity connections to the consumers. He said by January 15 next, all pending 0.8 million applications, would be disposed of.

 What do you think about the story ? Leave your comments!

Heading (Optional)
Your Comments: *

Your Name:*
E-mail (Optional):
City (Optional):
Country (Optional):
 
 
Field marked(*) are mandatory.
Note. The PakTribune will publish as many comments as possible but cannot guarantee publication of all. PakTribune keeps its rights reserved to edit the comments for reasons of clarity, brevity and morality. The external links like http:// https:// etc... are not allowed for the time being to be posted inside comments to discourage spammers.

  Speak Out View All
Military Courts
Imran - Qadri long march
 
Candid Corner
Exclusive by
Lt. Col. Riaz Jafri (Retd)
Pakistan itself a victim of state-sponsored terrorism: Qamar Bajwa
Should You Try Napping During the Workday?
Suggested Sites