Pakistan News Service

Sunday Sep 23, 2018, Muharram 12, 1440 Hijri
Logo
LATEST :
Pakistan News Home -> Tribune Corner -> News Details

Pak-India Permanent Indus Commission scheduled for Aug 29-30 in Lahore

27 August, 2018

  Related News  
PPP still firm on Aitzaz Ahsan nomination
Opposition to field joint candidate for president
  More on this View All

ISLAMABAD: Pakistan will reiterate its serious objections over two controversial water storage and hydropower projects being built by India during two-day Pakistan-India Permanent Indus Commission talks scheduled for Aug 29-30 in Lahore.

A government official told reporters that Indian Water Commissioner P. K Saxena, along with a delegation, was expected to reach Lahore on Tuesday to begin two-day discussions with his Pakistani counterpart Syed Mehr Ali Shah the next day.

The official said Pakistan would raise its concerns over 1000MW Pakal Dul and 48MW Lower Kalnai hydroelectric projects on River Chenab despite Islamabad’s serious objections over their designs. Pakistan has been raising reservations over the designs of the two projects and would like India to either modify the designs to make them compliant to 1960 Indus Waters Treaty or put the projects on hold until Delhi satisfies Islamabad.

The official said that the two sides would also finalise the schedule of future meetings of the Permanent Indus Commission and visits of the teams of the Indus commissioners. He said that the water commissioners of Pakistan and India were required to meet twice a year and arrange technical visits to projects’ sites and critical river head works, but Pakistan had been facing a lot of problems in timely meetings and visits.

The two-day session is also expected to discuss ways and means for timely and smooth sharing of hydrological data on shared rivers.

Both projects — Pakal Dul and Lower Kalnai —are on two different tributaries of Chenab river.

India had promised in March last year to modify the designs of two projects and address Pakistan’s concerns but in vain.

Instead Prime Minister Modi laid foundation stone of 1000mw Pakal Dul project in May this year to kickstart the project, without addressing Islamabad’s reservations. According to Indian media reports, the project’s completion is targeted within 66 months with a commitment to provide 12 per cent free of cost electricity to the occupied Jammu and Kashmir.

A former water sector official said that it was typical Indian style to build controversial projects in violation of the 1960 treaty as was evident from all previous controversial projects like Baglihar and Kishanganga. During execution of these projects, New Delhi engaged Islamabad in technicalities, but kept civil and side works moving for years until reaching the fait accompli stage, when challenged at international forums.

Pakistan has objections to pondage and freeboard of Lower Kalnai and pondage, filling criteria and spillway of Pakal Dul hydropower projects on Marusadar River – a right bank tributary of the Chenab.

Pakal Dul is a storage-cum-power project and can have gross storage of about 108,000 acre feet of water. The project design envisages it’s filling every monsoon season between mid-June and end-August.

Pakistan is of the opinion that the tunnel spillway of Pakal Dul should be raised closer to the dead storage level because its placement 40 metres below the dead storage level could allow drawdown flushing not permitted to India under the 1960 water treaty.

Pakal Dul dam-cum-hydropower project is three times larger than Kishan­ganga Hydroelectric Project that, Pakistan believes, has been built in violation of the treaty. Islamabad is seeking international arbitration without success at the level of intransigent World Bank administration.

On the 48MW Lower Kalnai project, Pakistan has raised objections to its freeboard, pondage and intake and is of the view that the depth of bridge girder and provision of freeboard should be close to one metre and considers two-metre freeboard as ‘excessive’.

Pakistan has also challenged the discharge series of River Lower Kalnai at Dunadi for winter months and estimated permissible pondage of 0.38 cubic megametres compared to Indian design pondage of 2.74 cubic megametres.

The Lower Kalnai project is on a left bank tributary of Chenab and can have gross storage of about 1,508 acre feet of water.

 What do you think about the story ? Leave your comments!

Heading (Optional)
Your Comments: *

Your Name:*
E-mail (Optional):
City (Optional):
Country (Optional):
 
 
Field marked(*) are mandatory.
Note. The PakTribune will publish as many comments as possible but cannot guarantee publication of all. PakTribune keeps its rights reserved to edit the comments for reasons of clarity, brevity and morality. The external links like http:// https:// etc... are not allowed for the time being to be posted inside comments to discourage spammers.

  Speak Out View All
Military Courts
Imran - Qadri long march
 
Candid Corner
Exclusive by
Lt. Col. Riaz Jafri (Retd)
Pakistan itself a victim of state-sponsored terrorism: Qamar Bajwa
Should You Try Napping During the Workday?
Suggested Sites